Gemco pursues a holistic approach for an optimally functioning foundry

End-to-end integration results in more stable production, shorter throughput times, fewer disruptions and greater control across the entire production process.

In reality, the efficiency of a foundry is not solely determined by installations and production processes. A suitable layout and good logistics are prerequisites. Gemco, as a foundry planning and consulting engineering company, is involved in the planning of new foundries or the modernisation of existing foundries.

“A foundry is a complex system of people and installations that exchange energy and material. The performance of a foundry is influenced by the specification of the production programme, the equipment, transport capacity, their interruptions and energy requirements,” explains Huub van der Weiden, Area Account Manager at Gemco Engineers B.V.

“The concept of casting systems, metallurgical properties, process control of mould and cores as well as ensuring consistent quality and punctual deliveries are emphasised in foundries. The installations are maintained and the machine builders focus on the continuous improvement of their machines, frequently with the involvement of the foundry customers. That is why, when considering a new investment, foundries and machine builders often spend a lot of time on improving the systems from the experience of both,” added van der Weiden.

“We are involved in the projects from conceptualisation up to implementation. Just as important for improvements, as the installations and the process itself, is an analysis of the various bottlenecks or the material flows to the installations. The core of Gemco’s work lies in the planning of new foundries or the modernisation of existing production installations allowing for an optimal selection as well as the effective interaction of systems and departments.”

Beyond individual equipment
“A modern foundry is more than melting, moulding, casting, cooling and post-processing. It depends on the coordinated interaction of people, material flows, energy supply, sustainability and digitalisation.”

“Gemco therefore pursues a holistic approach that goes far beyond the classic consideration of individual machines or production steps. The key is to consider all these factors as an integrated overall system from the starting point and thus create competitive and long-term profitable foundries.”

“End-to-end integration ensures that equipment is sized for actual capacity needs, bottlenecks are systematically identified and buffers are kept to the minimum required. Material flows are simplified and automated wherever this makes economic sense. Maintenance-friendly design and easy system access support high availability.”

“The result is more stable production, shorter throughput times, fewer disruptions and greater control across the entire production process.”

Buffer systems for more efficiency
“Good logistics in new foundries or changes to the logistics in an existing layout can already optimise the overall performance; in existing plants, often without affecting the capacity of the individual system.”

“Gemco analyses all logistical processes, the value stream and the essential transportation of all semi­finished products.”

“We make sure that the logistics of good parts, NOK parts and parts in quarantine do not mix. With the installation of matched buffer capacities, the utilisation of installations can be optimised and sub-processes can be better exploited.”

“Dynamic buffer systems, having products in different manufacturing states in shelves, usually automatic and high, reduce the overall buffer volume in the foundry. In addition to lower capital requirements (buffers are ultimately an area of factory space), this also leads to fewer human errors in logistics and often to fewer forklift truck movements, which promotes safety.”

“Beyond that, logistical calculations are important to achieve good material flow with buffers at strategic points to optimally manage the bottlenecks so that their maximum capacity is utilised.”

“Bottlenecks will always occur somewhere and then move elsewhere depending on which ones are resolved. However, it is beneficial to identify potential hold-ups and the most common bottlenecks in advance.”

“The use of different scenarios for different products is important as bottlenecks can be hidden because they can be based on, for example, wrong assumptions.”

“In this way, the various causes of bottlenecks in different installations and stages in the overall process sequence can be systematically identified. Derived from these findings, it becomes readily apparent which capacities are required for which installations and where buffers are desirable. Based on such an analysis, it is possible to make the right choice as to which bottlenecks need to be eliminated and which not,” continued van der Weiden.

“Gemco plans buffer systems keeping bottlenecks in the value stream in mind and always with the option of bypassing the buffer system in the event of a malfunction. During the detailed planning, attention is paid to the accessibility for maintenance, repair and operation in order to optimise the available uptime,” said van der Weiden.

“The logistics of ancillary and support processes must also be considered. It is important to optimise them, as these costs are not borne by the customer. This includes recycling material, but also waste streams such as slag, dust, scrap, used sand and others.”

“Gemco is of the opinion that their logistical routes should not cross each other. A robust concept is required for data traffic, cooling water, extraction and supply of fresh air, compressed air and electricity. Good logistical planning therefore makes an important contribution to the efficiency of the foundry, reduces human error and curtails costs. This also applies to the accessibility of the installations for maintenance and repair work, especially at the casting, moulding and blasting installations.”

Keeping internal and external logistics in mind
“In addition to the internal processes within the plant, care must also be taken in advance regarding the design of the external area and the surroundings of the plant. The area and space available outside the foundry are different for each project.”

“Truck and forklift traffic with different frequencies must constantly be kept in mind, as these are often subject to restrictions and even require permits.”

Points to consider include the following:

> Do measurements have to be carried out before a truck enters or leaves the works premises, such as for weighing or radioactivity measurements?
> How are the trucks loaded and unloaded?
> Which turning circles are required for the trucks?
> Are there regulations regarding circulation and/or heavy traffic on and to the site for 2nd and 3rd shifts?
> Are warehouses or storage areas required outside the foundry and where?

“For this purpose, all occurring and required movements must be taken into consideration,” van der Weiden ended.

For full details on the company’s design engineering services contact Gemco Engineers B V on TEL: +31 (0) 40 2643 607, email eng@gemco.nl or visit www.gemco.nl